The new age of power flow control: Optimising power flow in transmission networks

The investment and time required to build new lines has re-emphasised the importance of utilising existing  grid capacity. Further, existing network capacities remain under-utilised in some cases due to uneven power flows  in the network.  Read more: EPR Magazine

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60

FEEDBACK

    FEEDBACK