Solaris

Solar Energy Flow from the North and Northwest Regions of Minas Gerais.

PROJECT STORY

The Solaris Project has 298,20 km of transmission line to be built, the implementation of 1 new substation and the expansion of 2 other substations in the region of Minas Gerais state. Power of 800MVA.

This project is expected to generate 1007 direct / indirect jobs.

Project Detail

Length: 206 km
Power: 800 MVA
Deadline: 48 months
Estimate of direct jobs: 1.007
State: MG

TIMELINES

Preliminary Environmental license

Installation Environmental license

PROJECT GALLERY

RELATED LINKS

 MUMBAI URJA MARG LIMITED

GOA TAMNAR TRANSMISSION PROJECT LIMITED

LAKADIA VADODARA TRANSMISSION PROJECT LIMITED (LVTPL)

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60

FEEDBACK

    FEEDBACK