VINEYARDS

Assistance to the regions of Bento Gonçalves, Carlos Barbosa, Farroupilha, Garibaldi and Lajeado, in addition to increasing the reliability of the system.

PROJECT STORY

The Vineyard Project has 114,4 km of transmission line to be built, the implementation of 2 new substations and the expansion of some substations in the region to be deployed in the state of Rio Grande do Sul. Power of 496 MVA.

Project Detail

Length: 115 km
Power: 230 kv

TIMELINES

Preliminary Environmental license

Installation Environmental license

PROJECT GALLERY

RELATED LINKS

 MUMBAI URJA MARG LIMITED

GOA TAMNAR TRANSMISSION PROJECT LIMITED

LAKADIA VADODARA TRANSMISSION PROJECT LIMITED (LVTPL)

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60